This 31x60 house plan has a total built-up area of 9,300 sq ft across 5 storeys, on a 1,860 sq ft plot.
Yes, this 31x60 house plan is drawn for a west facing plot and is aligned with Vastu principles, with proper ventilation and natural light in every room.
The estimated construction cost for this 31x60 house plan is Rs 1.6 crore to Rs 2 crore for 9,300 sq ft of built-up area (Rs 1,700 to Rs 2,100 per sq ft, excluding land).
Yes, you can request up to two modifications to adjust room sizes or layout according to your preferences.
This house plan is designed for a plot 31 ft wide and 60 ft deep, a plot area of 1,860 sq ft.
residential cum commercial floor plan
Multistorey floor Plan
North facing house plan
31x60 Floor Plan
g+4 Floor Plan
multistory apartment floor plan
multistory house design
31x60 house plan
G+4 Floor Plan with Lift
floor plan for rental house
floor plan for rental apartment
rental apartment floor plan
rental floor plan for g+4 house
1860 sqft floor plan
g+4 floor plan for rental
Read More Read Less
Happy Customer
In-House Team
Cities Covered
Project Traceability
This Floor plan can be modified as per requirement for change in space elements like doors, windows and Room size etc taking into consideration technical aspects.
Detail drawings can be purchased Like Door- Window, Staircase, Structure, Electrical & Plumbing etc for which is mandatory for any construction to be followed onsite
CAD file of floor plan can be purchased with complete dimension and furniture layout, which can be modified by any Engineer or Architect for further changes
| Item | From | To |
|---|---|---|
| Mason (मिस्त्री) | ₹ 107975 | ₹ 142527 |
| Shuttering Carpenter | ₹ 72932 | ₹ 96280 |
| Painter | ₹ 7131 | ₹ 9414 |
| Labour | ₹ 204967 | ₹ 1270556 |
| Blacksmith | ₹ 19955 | ₹ 26341 |
| Total | ₹ 00000 | ₹ 00000 |
| Item | From | To |
|---|---|---|
| Earth Work & Excavation | ₹ 22800 | ₹ 28956 |
| Cement Bags | ₹ 133153 | ₹ 152328 |
| Sands | ₹ 231623 | ₹ 280264 |
| Aggregates/Gravels | ₹ 7118 | ₹ 122663 |
| Steel | ₹ 131851 | ₹ 159539 |
| Paints | ₹ 69000 | ₹ 97704 |
| Flooring | ₹ 94875 | ₹ 142313 |
| Granite | ₹ 92000 | ₹ 165600 |
| Glazed tiles | ₹ 57600 | ₹ 97344 |
| Doors | ₹ 346950 | ₹ 487118 |
| Plumbing | ₹ 110857 | ₹ 152429 |
| Electrical | ₹ 94875 | ₹ 123148 |
| Total | ₹ 00000 | ₹ 00000 |
Copyrights © 2026 makemyhouse.com, Mason's Mark Pvt. Ltd.
Venture All Rights Reserved.
Design & Developed by HUMUJ Technology and Consulting.
Click here to consult with us